SPF "DIEM" :: Beginning of public hearings on a project “Infrastructure development of Cenoman-Aptian fluid accumulation at Kharasavey GCF” - “Landfill facility”
RU
EN
(495) 333-7-444
News
16.06.14
Public consultations on the materials of the “Program of topographical, geotechnical, engineering environmental, hydromete…
30.05.14
Public consultations on the materials of the “Investment feasibility study of regasification terminal construction in Kali…
28.03.14
Beginning of public hearings on a project “Infrastructure development of Cenoman-Aptian fluid accumulation at Kharasavey GCF” - “Landfill facility”

In compliance with the Environmental impact assessment provision (State Committee for Environmental Protection order #372, 16.05.2000) ZAO “SPF “DIEM” now informs of the public hearings procedure opening on a project “Infrastructure development of Cenoman-Aptian fluid accumulation at Kharasavey GCF” - “Landfill facility”.

The following Terms and Conditions determine the scope and the schedule of the environmental impact assessment, and also - the requirements for EIA materials composition and content.

The Client is OOO “Gazprom dobytcha Nadym”, the Chief design contractor – OAO “VNIPIgazdobytcha”, EIA development contractor – ZAO “SPF “DIEM”.

Please forward your comments and suggestions on EIA Terms and Conditions to ZAO “SPF “DIEM”. Address: 117485, Russia, Moscow, Butlerova St. 12, POB 45. Phone: (495) 333-01-95; fax: (495) 333-80-23, е-mail: office(at)diem.ru.

Recent announces:

Photogallery

top

© SPF "DIEM", 2024
Our address:84/32, Profsouznaya str, Moscow, Russia 
Have a question? Contact us by:
office(at)diem.ru
Web Statistics