News
16.06.14
Public consultations on the materials of the “Program of topographical, geotechnical, engineering environmental, hydromete…
30.05.14
Public consultations on the materials of the “Investment feasibility study of regasification terminal construction in Kali…
03.04.14
Public hearings on oil spill response plan for the construction of the operating well R6, Kirinskoe gas condensate field
Hereby we inform on the beginning of public hearings on oil spill response plan for the construction of the operating well #R6, Kirinskoe GCF with the use of mobile floating drilling rig.
The Client – OOO “Gazprom geologorazvedka”: 625000, Russia, Tyumen, Gertsena St. 70. Phone: (3452)54-09-54, fax: (3452)54-09-55, e-mail:
The Chief design contractor – OOO “Krasnoyarskgazprom nefteproekt”: 660021, Krasnoyarsk, Gorkogo St., 3. Phone: (391) 256-80-30, fax: (391) 256-80-32, e-mail:
Please forward your comments and suggestions on the materials mentioned above to ZAO “SPF “DIEM”. Address: 117485, Russia, Moscow, Butlerova St. 12, POB 45. Phone: (495) 333-01-95; fax: (495) 333-80-23, е-mail: .