contact us
RU
EN
site map
(495)
333-7-444
Home
About
Services
Projects
Education and science
Contacts
News
16.06.14
Public hearings on materials of the “Program of topographical, geotechnical, engineering environmental, hydrometeorological surv…
Public consultations on the materials of the “Program of topographical, geotechnical, engineering environmental, hydromete…
30.05.14
Public hearings on pre-FEED materials of “Investment feasibility study of regasification terminal construction in Kaliningrad re…
Public consultations on the materials of the “Investment feasibility study of regasification terminal construction in Kali…
Announcements
30.04.14
Beginning of public hearings on the Scope of works at Kruzenshtern block quarry 1
22.04.14
ZAO “SPF “DIEM” informs of the beginning of public hearings on environmental impact assessment (EIA) following pre-FEED materials of the “Investment feasibility study of regasification terminal construction in Kaliningrag region” and on placement of EIA terms of reference
03.04.14
Public hearings on oil spill response plan for the construction of the appraisal well 5, Yuzhno-Kirinskoe field in the Sea of Okhotsk
03.04.14
Public hearings on oil spill response plan for the construction of the operating well R6, Kirinskoe gas condensate field
03.04.14
Public hearings on oil spill response plan for the construction of the appraisal well 6
28.03.14
Beginning of public hearings on a project “Infrastructure development of Cenoman-Aptian fluid accumulation at Kharasavey GCF” - “Landfill facility”
28.03.14
Beginning of public hearings on a project “Infrastructure development of Cenoman-Aptian fluid accumulation at Kharasavey GCF”
29.08.13
On the beginning of environmental impact assessment procedure on the basis of materials “Landfill facilities on compressor station CS-4 “Nimnyrskaya” as a part of project documentation of “Main pipeline “Power of Siberia”
29.08.13
On the beginning of environmental impact assessment procedure on the basis of materials “Landfill facilities on compressor station CS-5 “Nagornaya” as a part of project documentation of “Main pipeline “Power of Siberia”
13.08.12
On EIA procedure start for construction and implementation of main pipeline “Ukhta – Torzhok” (1st line) sites within borders of SPAs – state zoological reserves “Totemsky” and “Tuphanovsky”, Vologda region.
« Пред.
1
2
След. »
Photogallery
наверх
© SPF "DIEM", 2025
Our address:
84/32, Profsouznaya str, Moscow, Russia
Have a question? Contact us by:
office(at)diem.ru